WHAT IS THE AVERAGE TURNAROUND TIME FOR GUNDRILLING?
24 May 2019Gundrilling is a specialised art, so there can be a lot of confusion about basic variables such as time, cost, and quality. This can create a headache for buyers, especially as clients – who arrive from a variety of demanding sectors, such as aerospace, defence, and automotive – need to know that the finished product will meet their specifications with absolute precision. Let’s take a look at gundrilling timings.
How Long Does Specification Take?
The design and specification phase is absolutely crucial to successful gundrilling. This is where a little time investment should be allocated, as checking all of the finer detail on technical drawings makes all the difference to a successful outcome. The crucial determining factors are the bore and concentricity tolerances, as these affect the requirements for additional honing or turning and, therefore, the lead time.
A good manufacturer will need to review and invest a little time into this part of the process. Some orders are very easy to calculate; others may be more complex. As such, the specification can be highly variable! On average, expect around an hour or so depending on the complexity.